Task 1
In a group, we are required to design and construct a fettucini bridge of 750mm clear span and maximum weight of 200g. These requirements are to be met, or else it may result in reduction of grade. The bridge will be then tested to fail.
Other than aesthetic value, the design of the bridge must be of high efficiency, i.e. using the least material to sustain the higher load. The efficiency of the bridge is given as following;
Project 2
The project is an integrated component where it involves structural theory, force calculation and basic
structural proposal. This project is designed to allow the demonstration of knowledge and understanding of
building structure.
The objectives of this project are as follows:
To introduce the basic process
of building structures design process to the students.
To enable the students to have a holistic experience including Concept and Structure Layout
Design, Building Structure Engineering Cons